Main Menu

Revitalization of the Light Machining Plant

25.11.2024
👉 Not only the improvement of production quality but also the renewal and necessary renovation of workplaces is needed.
In the month of October, the workplace of two #CNC #lathes #PUMA 2600 LY II and PUMA 3100 XLY in the #Engineering Division was completed and put into operation.
🆕 The completed renovation includes not only new lathes but also new floors, slewing cranes, new workshop furniture, PC stations and tools.
The machines are already in trial operation, the first reference piece has been produced and the first real products have been debugged. At the same time, care has been taken to ensure that the renovated workstations ensure operator comfort not only in terms of ergonomy but also in terms of air quality, thanks to the evaporation of cutting emulsion vapours.
We would like to thank DN Solution for supplying the workstation. 👏